RFQ comparison for plant equipment

Plant equipment quotes differ in what they include, so the RFQ fixes the boundary.

A quote for a packing line, boiler or compressor station is mostly a statement of what the supplier will and will not supply. Two quotes of similar size can draw the boundary in different places: installation, controls, documentation, training. This page is about writing the RFQ so the boundary is asked for, and comparing the answers on it.

Scope of supplyInterfacesDocumentationAcceptance
The research question

Where does each supplier's scope of supply start and end, and who carries what is left over?

We structure your process requirement into a scope-of-supply list with the supplier's duties and your own duties in two columns. Each quote you receive is read against that list. The comparison is of coverage first, and price second, because a lower figure that leaves commissioning to you is not the same offer.

Where a quote is silent on an item, the matrix marks it unavailable and lists the question for the supplier.

Lines the RFQ asks each supplier to fill in

Lines the RFQ asks each supplier to fill in

Equipment and options

Main equipment, optional items priced separately, and items the supplier treats as standard.

Interfaces with your plant

Power, air, water, floor loads, controls signals and software links, with who provides each side.

Documentation set

Drawings, manuals, spare-parts lists and language of documents, shown as offered by the supplier.

Installation and commissioning

Whether done by the supplier, supervised by the supplier or left to you.

Acceptance and performance figures

The tests the supplier proposes and the figures it states, shown as stated by the supplier and not as results.

Spares and service

Recommended spares packages and stated support arrangements, as written.

Scenarios

Scenarios

A food factory adding a line

Hygiene and utilities interfaces dominate; the matrix gives them their own rows.

A workshop replacing an ageing compressor

Because the old unit stays in place during the change, installation arrangements are listed before any equipment feature.

A plant buyer comparing a European and an Asian supplier

Documentation language and service location are shown beside each quote as stated.

What this does not do

What this does not do

Engineering design

We do not specify or size equipment; you or your engineer provide the requirement.

Contract review

Terms of sale are flagged where missing, not reviewed as legal text.

Supplier performance

Stated performance figures are not tested.

Step by step

From requirement to comparison

01

Write the requirement as functions

What the plant must do, capacity range and operating conditions, without naming a brand.

02

One RFQ with one answer sheet

The drafted RFQ and its answer sheet are the same for every supplier you choose, so options and exclusions line up in the answers.

03

Read for scope before price

The matrix is first completed for coverage; prices are restated afterwards on the same coverage.

04

Hand back a gap list

Questions per supplier, listed so open points can be closed before a decision is taken.

The service

RFQ and Supplier Comparison

Who it is for
Buyers collecting quotes who need a clean request and a like-for-like comparison of the answers
The problem it solves
Quotes arrive in different formats, units and terms and cannot be compared; the request itself leaves gaps
What we need from you
  • specification and quantities
  • suppliers or shortlist
  • quotes received, if any
  • comparison criteria and weighting
How it works
  • requirements agreed
  • RFQ drafted
  • quotes normalised and compared
  • comparison and summary delivered
What you receive
An RFQ document and a comparison matrix: quotes normalised to a stated basis, gaps and missing terms flagged, a weighted comparison and a recommendation summary with its assumptions
Included
  • RFQ drafted from your specification
  • quote collection framework
  • normalisation and like-for-like comparison
  • gaps and missing terms flagged
  • recommendation summary with assumptions
Not included
  • negotiating or placing orders
  • regulated public tendering or bid submission
  • freight quotes or landed-cost calculation
  • legal contract review
  • guaranteeing a supplier's performance
Timing
Confirmed when your request is accepted.
What LATYNEX does
  • agree requirements
  • draft the RFQ
  • normalise and compare quotes
  • write up the summary
Price
Confirmed when your request is accepted.
Good to know

What this is, and isn't

Research reports what can be established from public and provided sources. It is not a guarantee about a counterparty's future conduct and not legal advice.

FAQ

Frequently asked questions

Do you write the technical specification?+

No. We structure your requirement into an RFQ; the engineering content comes from you or your engineer.

Can you place the order?+

No. Negotiating and ordering are excluded.

What if only one supplier answers?+

The summary says so and shows what could and could not be compared.

Request

Tell us what you need.

No obligation. We read your request and reply with a straight answer.

Research

Know the counterparty before you commit.

Tell us what you need to find out and by when. We confirm scope before any work starts.

Request research