RFQ drafting

From your specification to a request suppliers can answer.

Quotes that cannot be compared can trace back to a request that left room for each supplier to answer a slightly different question. The decision this page serves is what has to be written into a request for quotation, and in what form, so the answers come back on the same footing.

RFQ documentFixed answer formatStated assumptionsOpen points listed
The decision question

What must the request say so that two answers can be laid side by side?

You bring a specification, a drawing, a sample description or a product brief, written for your own team. We translate it into an RFQ document: the item described in terms a supplier can price, the quantities and any ranges you want priced separately, the commercial terms you ask each supplier to state, and a response sheet with the same rows for everyone. You receive the RFQ itself, a note of the assumptions we made, and the points in your specification that were ambiguous and need your decision before sending.

We draft and structure the request. Negotiating with suppliers and placing orders are outside the service. Where the specification touches a regulated requirement, the RFQ asks the supplier to state what it holds and does not say what is required.

Three specifications, three different drafting problems

Three specifications, three different drafting problems

An engineering drawing with tolerances

The risk is that a supplier prices a looser version. The RFQ separates what is mandatory from what is preferred and asks each supplier to flag any deviation it assumed, so a cheaper answer cannot hide a changed part.

A retailer's private-label brief with a sample in hand

The sample carries qualities the words do not. The RFQ turns the visible attributes into stated points, asks for the supplier's own wording of material and finish, and marks which attributes you want matched exactly.

A repeat purchase where the old supplier's quote is the only reference

The existing invoice quietly contains terms nobody wrote down. We lift them out of the paperwork and into the request so new suppliers answer against the same real conditions.

What the request cannot do

What the request cannot do

It cannot make suppliers answer honestly

A well-formed request makes a gap visible; it does not stop a supplier from stating something optimistic.

It does not set the commercial strategy

Which suppliers to ask and how many volumes to price are decisions you take; we draft within them.

Step by step

How the draft is built

01

Read the specification as a supplier would

We list the statements a supplier could read two ways, the missing quantity bases and the attributes that are described but not measurable.

02

Settle the open points with you

Each ambiguity returns to you as a question with the realistic options, because the choice changes the price and is yours to make.

03

Fix the answer format

Units, currency basis, quantity breaks, validity and the commercial terms each supplier must state are laid out as a response sheet, so the later comparison is a matter of reading across.

04

Hand over the RFQ with its assumptions

The document and the assumptions note go to you together, so you can see which line of the request rests on a guess.

The service

RFQ and Supplier Comparison

Who it is for
Buyers collecting quotes who need a clean request and a like-for-like comparison of the answers
The problem it solves
Quotes arrive in different formats, units and terms and cannot be compared; the request itself leaves gaps
What we need from you
  • specification and quantities
  • suppliers or shortlist
  • quotes received, if any
  • comparison criteria and weighting
How it works
  • requirements agreed
  • RFQ drafted
  • quotes normalised and compared
  • comparison and summary delivered
What you receive
An RFQ document and a comparison matrix: quotes normalised to a stated basis, gaps and missing terms flagged, a weighted comparison and a recommendation summary with its assumptions
Included
  • RFQ drafted from your specification
  • quote collection framework
  • normalisation and like-for-like comparison
  • gaps and missing terms flagged
  • recommendation summary with assumptions
Not included
  • negotiating or placing orders
  • regulated public tendering or bid submission
  • freight quotes or landed-cost calculation
  • legal contract review
  • guaranteeing a supplier's performance
Timing
Confirmed when your request is accepted.
What LATYNEX does
  • agree requirements
  • draft the RFQ
  • normalise and compare quotes
  • write up the summary
Price
Confirmed when your request is accepted.
Good to know

What this is, and isn't

Research reports what can be established from public and provided sources. It is not a guarantee about a counterparty's future conduct and not legal advice.

FAQ

Frequently asked questions

Does the service include sending the RFQ?+

The service is drafting the RFQ, a quote collection framework and the comparison of the answers. Negotiating with suppliers and placing orders are outside it.

What if my specification is only a sample and a few notes?+

That is a normal starting point. The assumptions note will show what we had to infer from the sample, and each of those points is returned to you to confirm.

Does the RFQ include shipping terms?+

It asks suppliers to state the delivery basis they quote on. Shipping itself is a separate LATYNEX service.

Request

Tell us what you need.

No obligation. We read your request and reply with a straight answer.

Research

Know the counterparty before you commit.

Tell us what you need to find out and by when. We confirm scope before any work starts.

Request research